Port Frank

This project was a basement bathroom addition. The basement itself was given an egress window with a window well and an ejector pump for the septic system. The walls were framed and drywalled, then mud, tape, and paint were applied to finish them off. For the addition of a bathroom, lighting was installed and plumbing was added for the new toilet, glass shower, and vanity. The tile flooring included in-floor heating, and a pocket door was added for privacy. These additions are sure to impress future buyers and add significant value to the home.

Project Gallery

Before & After

Bathroom Renovation

Share This Page With Others

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on pinterest
Pinterest
Share on reddit
Reddit
Share on email
Email
Scroll to Top
Call Now Button